A | B | C | D | E | F | G | H | CH | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9
![]() | You can help expand this article with text translated from the corresponding article in Hungarian. (August 2021) Click for important translation instructions.
|
M49 expressway | |
---|---|
M49-es autóút | |
![]() | |
Route information | |
Length | 45 km (28 mi) (planned length) |
Major junctions | |
From | ![]() |
| |
To | ![]() |
Location | |
Country | Hungary |
Counties | Szabolcs-Szatmár-Bereg |
Highway system | |
|
The M49 expressway (Hungarian: M49-es autóút) is a planned 45 km (28 mi) long expressway in Hungary that will link the M3 motorway to the border with Romania near Csenger, connecting with Romania's A14 motorway towards Satu Mare. Upon completion, it will serve as a continuation of the Romanian high-speed road to Budapest, the capital of Hungary.[1][2]
Timelineedit
Section | Length | Opened | Notes |
---|---|---|---|
Vaja (M3) – Ököritófülpös | 28.2 km (17.52 mi) | Planned in 2026 | Under construction |
Ököritófülpös – Csenger (border) | 17.5 km (10.87 mi) | Planned |
Route descriptionedit
- The route will be full length expressway. The maximum speed limit is 110 km/h, with
(2x2 lane road).
![]() | This article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table.(November 2021) |
County | km | Type | Destination | Notes | |
---|---|---|---|---|---|
![]() Szabolcs-Szatmár-Bereg |
0 | ![]() |
![]() ![]() ![]() ![]() |
The western terminus of the ![]() Kilometrage starting point Western under construction section | |
1 | ![]() |
![]() |
|||
7 | ![]() |
![]() |
|||
14 | ![]() |
Mátészalkai pihenőhely | pihenőhely means Rest area | ||
13 | ![]() |
Kraszna híd | híd means Bridge | ||
14 | ![]() |
![]() |
|||
28 | ![]() |
![]() |
Eastern under construction section | ||
31 | ![]() |
Porcsalma, Tyukod | Planned | ||
41 | ![]() |
Csenger / Csengerújfalu | |||
45 | ![]() |
Csenger (H) – Vetiș-Oar II. (RO) border crossing![]() |
Planned | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
See alsoedit
Referencesedit
- ^ "M49 – Gyorsforgalmi út épül Mátészalkától a román határig". azuzlet.hu (in Hungarian).
- ^ "Indul a Mátészalkától az erdélyi határig futó M49-es tervezése". magyarepitok.hu (in Hungarian).
External linksedit
- National Toll Payment Services Plc. (in Hungarian, some information also in English)
- National Infrastructure Developer Ltd.
Text je dostupný za podmienok Creative Commons Attribution/Share-Alike License 3.0 Unported; prípadne za ďalších podmienok. Podrobnejšie informácie nájdete na stránke Podmienky použitia.
Antropológia
Aplikované vedy
Bibliometria
Dejiny vedy
Encyklopédie
Filozofia vedy
Forenzné vedy
Humanitné vedy
Knižničná veda
Kryogenika
Kryptológia
Kulturológia
Literárna veda
Medzidisciplinárne oblasti
Metódy kvantitatívnej analýzy
Metavedy
Metodika
Text je dostupný za podmienok Creative
Commons Attribution/Share-Alike License 3.0 Unported; prípadne za ďalších
podmienok.
Podrobnejšie informácie nájdete na stránke Podmienky
použitia.
www.astronomia.sk | www.biologia.sk | www.botanika.sk | www.dejiny.sk | www.economy.sk | www.elektrotechnika.sk | www.estetika.sk | www.farmakologia.sk | www.filozofia.sk | Fyzika | www.futurologia.sk | www.genetika.sk | www.chemia.sk | www.lingvistika.sk | www.politologia.sk | www.psychologia.sk | www.sexuologia.sk | www.sociologia.sk | www.veda.sk I www.zoologia.sk