Bandar Utama–Klang line - Biblioteka.sk

Upozornenie: Prezeranie týchto stránok je určené len pre návštevníkov nad 18 rokov!
Zásady ochrany osobných údajov.
Používaním tohto webu súhlasíte s uchovávaním cookies, ktoré slúžia na poskytovanie služieb, nastavenie reklám a analýzu návštevnosti. OK, súhlasím


Panta Rhei Doprava Zadarmo
...
...


A | B | C | D | E | F | G | H | CH | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9

Bandar Utama–Klang line
 ...
Shah Alam Line
Overview
Other name(s)LRT 3
Native nameLRT Laluan Shah Alam
StatusUnder construction
OwnerPrasarana Malaysia
Line number11 (sky blue)
LocaleKlang Valley
Termini
Stations25 (under construction)
Websitelrt3.com.my
Service
TypeMedium-capacity rail system
SystemRapid KL (brand) Rapid KL
Operator(s)Rapid Rail
Depot(s)Johan Setia Depot
Rolling stockCRRC Zhuzhou LRV
25 three-cars trainsets[1]
Width: 2.7 m (8 ft 10 in) - narrow profile
Length: 57.60 m (189.0 ft)
History
Planned opening1 March 2025; 7 months' time (1 March 2025)[2]
Technical
Line length37.8 km (23.5 mi)[3]
Elevated: 35.8 km (22.2 mi)
Underground: 2 km (1.2 mi)[4]
Number of tracks2
Character95% Elevated, and 5% Underground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Conduction systemAutomated and driverless
Operating speed80 km/h (50 mph)
Route map

KG09
SA1
Bandar Utama
SA2
Kayu Ara
SA3
BU11 Parking
SA4
Tropicana
SA5
Damansara Idaman Parking
SA6
SS7
SA7
KJ27
Glenmarie
Parking
SA8
Temasya
SA9
Kerjaya
SA10
Stadium Shah Alam Parking
Phase 2
Phase 1
SA12
Dato' Menteri
SA13
Raja Muda
SA14
UiTM Shah Alam
SA15
Seksyen 7 Shah Alam Parking
SA16
Bukit Raja Selatan
SA17
Bandar Baru Klang Parking
SA18
Pasar Klang Parking
SA19
Jalan Meru
SA20
Pasar Jawa
KD14
Klang Parking
SA21
Taman Selatan
SA22
Sri Andalas Parking
SA23
Klang Jaya
SA24
Bandar Bukit Tinggi Parking
SA25
Bandar Botanik
SA26
Johan Setia Parking

Interchange stations

integrated paid area
single fare trip
non-integrated paid area
multiple fare trips
interchange within same building
or cross-platform interchange

The LRT Shah Alam Line, previously known as the LRT Bandar Utama–Klang Line, LRT Bandar Utama-Johan Setia Line or simply LRT Johan Setia Line,[5] is a medium-capacity light rapid transit (LRT) line which will be serving the Shah Alam and Klang regions on the western side of the Klang Valley, Malaysia. It will be the third LRT line, and the fourth fully automated and driverless rail system in the Klang Valley region. The line will be operated as part of the Rapid KL system by Rapid Rail, a subsidiary of Prasarana Malaysia.[6][7] It was announced by Prasarana Malaysia on 24 April 2013.[8][9]

Once completed, the line will form part of the Klang Valley Integrated Transit System. It is numbered 11 and coloured sky blue on official transit maps.

The line is one out of four rapid transit lines in the Klang Valley that does not serve KL Sentral, the other three being the Ampang Line, Sri Petaling Line and the Putrajaya Line, as well as the first rapid transit line in the Klang Valley that is entirely outside the borders of the Federal Territory of Kuala Lumpur.

Stations

Map
Location of Shah Alam Line
LRT3 elevated bridge under construction across Klang River.
Damansara Idaman LRT station.

Previously, a total of 26 stations were planned, with a proposed two-kilometre distance between each station. One station was to be an underground station, with the other 25 being elevated.

The LRT3 will feature a few interchange stations. The planned interchanges are  KG09  Bandar Utama on the MRT Kajang Line and  KJ27  CGC-Glenmarie on the LRT Kelana Jaya Line.

The alignment is based on the Final Railway Scheme approved by the Land Public Transport Commission (SPAD).

Due to the change of government in the 2018 Malaysian general election, the new Pakatan Harapan government decided to cut costs around the project and shelved six stations from the initial plan. The Lien Hoe, Temasya, SIRIM, Bukit Raja and Bandar Botanik stations were converted into provisional stations while the underground station of Persiaran Hishamuddin was cancelled. The reasons cited for the changes made were due to the high cost of the project, unnecessary tunneling for the underground portion of the line and low ridership in the area. The provisional stations however will be built once the demand in the area picks up.[10][11]

Other cost-cutting exercises including the swapping of six-car trains for three-car trains, cutting down the total trains from 42 to 22, reducing the size of the stations and ditching costly acceleration techniques. The completion date also was extended from 2020 to 2024.[10][11]

In July 2023, Transport Minister Anthony Loke mentioned that the overall line would be expected to be operational by 1 March 2025 adding more delays to the opening of the Shah Alam Line.[12] This would be the third delay to the project's completion date.

During the Budget 2024 presentation held on 13 October 2023, Finance Minister Dato' Seri Anwar Ibrahim announced the reintegration of the five stations that were previously under provisional status (Tropicana, Temasya, Raja Muda, Bukit Raja Selatan, Bandar Botanik) to be built alongside the rest of the Shah Alam Line with the exception of the sole underground station, Persiaran Hishamuddin, which remains cancelled.[13]

Alignment and station list

The line currently has 25 permanent stations under construction.[14]

Zdroj:https://en.wikipedia.org?pojem=Bandar_Utama–Klang_line
Text je dostupný za podmienok Creative Commons Attribution/Share-Alike License 3.0 Unported; prípadne za ďalších podmienok. Podrobnejšie informácie nájdete na stránke Podmienky použitia.






Text je dostupný za podmienok Creative Commons Attribution/Share-Alike License 3.0 Unported; prípadne za ďalších podmienok.
Podrobnejšie informácie nájdete na stránke Podmienky použitia.

Your browser doesn’t support the object tag.

www.astronomia.sk | www.biologia.sk | www.botanika.sk | www.dejiny.sk | www.economy.sk | www.elektrotechnika.sk | www.estetika.sk | www.farmakologia.sk | www.filozofia.sk | Fyzika | www.futurologia.sk | www.genetika.sk | www.chemia.sk | www.lingvistika.sk | www.politologia.sk | www.psychologia.sk | www.sexuologia.sk | www.sociologia.sk | www.veda.sk I www.zoologia.sk


Station Code Working Name Interim Name Station Layout Platform Type Interchange / Notes
 SA01  Bandar Utama One Utama Elevated Side Eastern terminus.

Interchange station with  KG09  MRT Kajang Line.

 SA02  Kayu Ara Damansara Utama Elevated Island
 SA03  BU 11 Tropicana Elevated Island
 SA04  Tropicana Lien Hoe Elevated
 SA05  Damansara Idaman Dataran Prima Elevated Side
 SA06  SS7 Persada Plus / Kelana Indah Elevated
 SA07  Glenmarie Glenmarie 2 Elevated Side Interchange station with  KJ27  LRT Kelana Jaya Line.
 SA08  Temasya Temasya Elevated
 SA09  Kerjaya HICOM-Glenmarie / Persiaran Kerjaya Elevated Side
 SA10  Stadium Shah Alam Malawati Elevated Island
 SA11  Tunnel Ventilation Control Persiaran Hishamuddin Underground Cancelled[15]
 SA12  Dato' Menteri Section 14 / Bandar Anggerik / Bandaraya Shah Alam Elevated
 SA13  Raja Muda SIRIM / Seksyen 2 Elevated
 SA14  UiTM Shah Alam UiTM Elevated Island
 SA15  Seksyen 7 Shah Alam i-City / Hospital Shah Alam Elevated Side 2.4 km from  KD12  Padang Jawa on the KTM Tanjung Malim-Port Klang Line.
 SA16  Bukit Raja Selatan Lebuh Keluli Elevated