Line 3 (Chennai Metro) - Biblioteka.sk

Upozornenie: Prezeranie týchto stránok je určené len pre návštevníkov nad 18 rokov!
Zásady ochrany osobných údajov.
Používaním tohto webu súhlasíte s uchovávaním cookies, ktoré slúžia na poskytovanie služieb, nastavenie reklám a analýzu návštevnosti. OK, súhlasím


Panta Rhei Doprava Zadarmo
...
...


A | B | C | D | E | F | G | H | CH | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9

Line 3 (Chennai Metro)
 ...

Purple Line (Line 3)
Overview
StatusUnder construction
Termini
Stations47
Service
TypeRapid transit
SystemChennai Metro
Operator(s)Chennai Metro Rail Limited
Technical
Line length45.4 km (28.2 mi)
Number of tracks2
Character26.3 km (16.3 mi) Underground
19.1 km (11.9 mi) Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Operating speed80 km/h (50 mph)
Route map

Madhavaram Milk Colony  Red Line 
Madhavaram High Road
Moolakadai
Sembiyam
Perambur Market
Perambur Mainline rail interchange
Ayanavaram
Otteri
Pattalam
Perambur Barracks Road
Purasaiwakkam
Kellys
Kilpauk  Green Line 
Chetpet Mainline rail interchange
Sterling Road
Nungambakkam
Anna Flyover
Thousand Lights  Blue Line 
Royapettah
Dr. Radhakrishnan Salai
Thirumayilai Mainline rail interchange  Orange Line 
Mandaveli
Greenways Road
Adyar Junction
Adyar Depot
Indira Nagar, Chennai
Thiruvanmiyur Mainline rail interchange
Tharamani
Nehru Nagar
Kandanchavadi
Perungudi
Thoraipakkam
Mettukuppam
PTC Colony
Okkiyampet
Karapakkam
Okkiyam Thoraipakkam
Sholinganallur  Red Line 
Sholinganallur Lake I
Sholinganallur Lake II
Semmancheri I
Semmancheri II
Gandhi Nagar
Navallur
Siruseri
SIPCOT 1
SIPCOT 2

The Purple Line or Line 3 is one of the planned lines of Chennai Metro. It is part of the second phase of the project and the under construction line stretches from Madhavaram Milk Colony to Siruseri SIPCOT. The 45.4 km (28.2 mi) long line will consist of 47 stations, out of which 28 will be underground and 19 will be at grade or elevated.

Planning and construction

Phase II

The construction of the first phase of Chennai Metro started in June 2009.[1] Commercial operations started on the green line in June 2015.[2][3][4] On 10 February 2019, the extension of blue line was opened, completing the first phase of the metro.[5]

In July 2016, Government of Tamil Nadu announced that the second phase would have three lines totaling 104 km (65 mi) in length with 104 stations.[6][7] Two corridors would extend from Madhavaram connecting with Siruseri and Sholinganallur respectively (lines 3 and 5) with the third corridor connecting Koyambedu with Lighthouse (line 4). The third line connecting Madhavaram Milk Colony and Siruseri SIPCOT will extend to 45.8 km (28.5 mi) of which 19.1 km (11.9 mi) would be elevated and 26.7 km (16.6 mi) underground. It will consist of 50 stations including 30 undergrounds stations.[8][9] The stations for the second phase were designed to be smaller than the existing stations operational in the first phase.[10]

On 20 November 2020, foundation stone for the second phase was laid and construction commenced.[11] In November 2022, Alstom was awarded the contract to supply metro coaches for the phase II expansion.[12] In May 2023, CMRL announced a revised plan for the second phase revising the station count on the third line to 47.[13] As per the final plan, the fourth line will extend for 45.4 km (28.2 mi).[14]

Chennai Metro - Phase II[15]
Line Name Terminals Length (km) Stations Status
Purple Line Madhavaram Siruseri 45.4 46 Under construction

The second phase is estimated to cost 63,246 crore (US$7.6 billion) of which initially 4,710 crore (US$560 million) was loaned by JICA.[8][16][17] On 14 February 2021, Prime Minister of India announced that the government has set aside 63,000 crore (US$7.5 billion) for the construction of phase II and further extension.[18]

Phase II extension

In 2022, the state government proposed an extension plan for the third line from Siruseri to Kilambakkam, covering an approximate 25 km (16 mi).[19] In September 2023, feasibility report was submitted by CMRL for the proposed expansion of the line, green lighting the same.[20] The extension was scrapped due to patronage and profitability concerns.[21]

Chennai Metro - Phase II Extension[20][21]
Line Terminals Length Stations Status
Purple Line Siruseri Kilambakkam 25 km (16 mi) TBD DFR submitted; Proposal dropped

Stations

Zdroj:https://en.wikipedia.org?pojem=Line_3_(Chennai_Metro)
Text je dostupný za podmienok Creative Commons Attribution/Share-Alike License 3.0 Unported; prípadne za ďalších podmienok. Podrobnejšie informácie nájdete na stránke Podmienky použitia.






Text je dostupný za podmienok Creative Commons Attribution/Share-Alike License 3.0 Unported; prípadne za ďalších podmienok.
Podrobnejšie informácie nájdete na stránke Podmienky použitia.

Your browser doesn’t support the object tag.

www.astronomia.sk | www.biologia.sk | www.botanika.sk | www.dejiny.sk | www.economy.sk | www.elektrotechnika.sk | www.estetika.sk | www.farmakologia.sk | www.filozofia.sk | Fyzika | www.futurologia.sk | www.genetika.sk | www.chemia.sk | www.lingvistika.sk | www.politologia.sk | www.psychologia.sk | www.sexuologia.sk | www.sociologia.sk | www.veda.sk I www.zoologia.sk


Purple Line
S.No Station Name[15] Connections Layout Opened
English Tamil
1 Madhavaram Milk Colony மாதவரம் பால் பண்ணை   Red Line Underground Under construction
2 Madhavaram High Road மாதவரம் நெடுஞ்சாலை
3 Moolakadai மூலக்கடை
4 Sembiyam செம்பியம்
5 Perambur Market பெரம்பூர் அங்காடி
6 Perambur பெரம்பூர் Mainline rail interchange West Line, Chennai Suburban (Perambur)
7 Ayanavaram அயனாவரம்
8 Otteri ஓட்டேரி
9 Pattalam பட்டாளம்
10 Perambur Barracks Road பெரம்பூர் பேரக்ஸ் சாலை
11 Purasaiwakkam புரசைவாக்கம்
12 Kellys கெல்லீஸ்
13 Kilpauk கீழ்ப்பாக்கம்   Green Line 15 May 2017
14 Chetpet சேத்துப்பட்டு Mainline rail interchange South Line, Chennai Suburban (Chetpet) Under construction
15