Türk Telekom Stadium
 ...
Ali Sami Yen Spor Kompleksi
Ali Sami Yen
Aslantepe
Map
Full nameRams Park
Former namesTürk Telekom Arena (2011–2017)
Türk Telekom Stadium (2017–2021)
Nef Stadium (2021–2023)
LocationKâğıthane, Istanbul, Turkey
Coordinates41°6′10″N 28°59′26″E / 41.10278°N 28.99056°E / 41.10278; 28.99056
Public transitIstanbul Metro Line M2 Line F3 Seyrantepe
OwnerGalatasaray
OperatorGalatasaray
Executive suites221[9]
Capacity53,798
Capacity history
  • 52,695 (2011–2013)
    52,280 (2013–2023)
    53,798 (2023–)[8]
Record attendance53,755 (Fenerbahçe, 19 May 2024)
Field size105 m × 68 m (115 yd × 74 yd)
Acreage190,000 m²
SurfaceGrass (2011–2018)
SISGrass
Scoreboard2 x 77,41m²[1]
Construction
Broke ground13 December 2007; 16 years ago (2007-12-13)
Built2007–2011
Opened15 January 2011; 13 years ago (2011-01-15)
Construction costUS$250 million
($339 million in 2023 dollars[2])[3][4]
Architect'asp' architekten Stuttgart[5]
Structural engineerİz Mühendislik
Yüksel Proje
Schlaich Bergermann & Partner[6]
Services engineerOBERMEYER: Planungsgesellschaft[7]
Main contractorsVaryap

Uzunlar Ortak Girişimi

TOKİ
Tenants
Galatasaray (2011–present)
Turkey national football team (selected matches)

Ali Sami Yen Spor Kompleksi (commonly known as Ali Sami Yen Stadium), branded as Rams Park for sponsorship reasons, is a football stadium serving as the home ground of the Süper Lig club Galatasaray. It is located in the Seyrantepe quarter of the Sarıyer district,[10] on the European side of Istanbul, Turkey. The all-seater stadium has the capacity to host 53,798[8] spectators during football games. The Rams Park is part of the Ali Sami Yen Sports Complex, named after the club's founder.

Rams Park was the first stadium in Turkey that met the UEFA Euro 2016 requirements during the country's bid to host the European Championship.[11] In 2011, Rams Park was one of the six nominees for the Venue of the Year and New Venue categories of the Stadium Business Awards.[12] Galatasaray S.K. won the Süper Lig in the first season at Rams Park. Rams Park and Galatasaray S.K. were mentioned in the first chapter of Tom Clancy's 2012 novel Threat Vector.[13]

The Rams Park is one of the potential venues for the UEFA Euro 2032.

History

Exterior of the stadium
Main road to the stadium
Interior view of the stadium
VIP Seats and suite levels
Galatasaray fans teasing their arch-rival Fenerbahçe. The matches between the two teams are known as the Intercontinental Derby.

Association football was first played in Istanbul by some British players in a field known as Papazın Çayırı ("Priest's Field") in the area that is now the site of Fenerbahçe's Şükrü Saracoğlu Stadium. With the opening of the Taksim Stadium in 1921, it was this new stadium that became the new football headquarters. In the urban development of 1939, the military barracks in which the Taksim Stadium was located was demolished in 1940. The stadium was thus lost. In this period, Fenerbahçe bought the land encompassing Papazın Çayırı and built the Fenerbahçe Stadium, while the Beşiktaş Club moved into the Şeref Stadium, located in the area where today's Çırağan Palace Hotel stands. It was Galatasaray that experienced the biggest problem with the use of a stadium in that period.

The first steps to overcome this problem were taken in the initial years of the 1930s. The first initiative to acquire a plot of land for Galatasaray was in 1933, when the then president of the club Ali Haydar Barşal showed an interest in a mulberry orchard in Mecidiyeköy. In the period between 1933 and 1935, negotiations with the government resulted in the allocation of a plot of land outside of the city limits in Mecidiye Köyü (Mecidiye Village, present-day Mecidiyeköy quarter of the Şişli district) for a stadium to be built for Galatasaray. Excavations for the construction began in 1936. The President of the Turkish Sports Organization at the time, Adnan Menderes, provided financial assistance for the project. However, the efforts were left in the excavation stage.

In 1940, the matter of the stadium came up again under the presidency of Tevfik Ali Çınar. The same plot of land was leased to Galatasaray for a term of 30 years at a symbolic yearly rental fee of 1 lira. Galatasaray thus acquired the right to the use of the land. In leasing the land, Galatasaray committed to building a modern stadium as well as a bicycle velodrome. The construction could not start, however, due to limited funds and the general atmosphere of the war years. In 1943, Osman Dardağan led an initiative to build a modest stadium that would answer the immediate need. In the atmosphere of war, only a small open tribune was allowed in the stadium, which was set on a field of earth and inaugurated under the presidency of Muslihittin Peykoğlu in 1945. However, its distance from the city center in those days, its inaccessibility by public transportation, and the rough winds that characterized the district were factors that contributed to a long period in which the stadium would lay idle and football games never took place.

When the İnönü Stadium in the center of the city was opened in that period, Galatasaray abandoned the stadium building project in Mecidiyeköy, putting the project aside before fruition. In 1955, 30 more years were added to the right of utilization agreement, which at the time had 22 years to go, extending the terms until 2007. When the Club failed to undertake the building of the Stadium, the project was taken on by the Physical Education General Directorate. The construction started in 1959. In 1961, during the presidency of Refik Selimoğlu, a new agreement was signed with the Physical Education General Directorate whereby the utilization rights of the newly completed stadium were explicitly given to Galatasaray.

The stadium was opened on an eventful December 20, 1964. In the midst of the extreme crowds present, panic broke out, resulting in the death of one spectator and the injury of 80 others. In 1965, the stadium was illuminated for the first time. Despite this, however, not many night games were played. At the beginning of the 1970s, the stadium was abandoned for another period during which the İnönü Stadium began to be used again. In the 1970s, the stadium was mostly used by Galatasaray for training sessions. In those years, it remained in a squalid state of neglect.

In 1981, grass was planted on the field and the stadium was opened again. The lighting system was renewed in 1993, after which night games began to be played once more. In the same year, the system of combined tickets was initiated in Turkey at the Ali Sami Yen Stadium. Also in the same year, the stadium was furnished with seats to replace the old benches. The capacity of the stadium was thus reduced from 35,000 to an all-seater capacity of 22,000. In 1997, the Galatasaray administration assigned a Canadian architectural firm for the task of designing Turkey's first multi-function, modern stadium to be built in place of the Ali Sami Yen Stadium, which was planned to be torn down.

On 10 December 2013, a UEFA Champions League match between Galatasaray and Juventus had to be abandoned due to heavy snow in the 32nd minute with the score 0–0, the remaining minutes of the match were played the next day.[14]

New stadium projects

Faruk Süren project

The new stadium project was launched in 1998 and it attracted wide interest. During the promotion of the modern loge system, the entire loge section was sold at a symbolical fee. The proposed capacity was 40,484. However, the mayor and the state did not allow of a stadium to be built.

Mehmet Cansun project

Over the period of 2001–2002, a revision was made in the project with an eye toward reducing the amount needed for financing but this time, although costs were brought down, the economic crisis of 2001 stood in the way of overcoming the financial issue. Capacity was reduced to 35,000.

Özhan Canaydın: Back to Süren's project

In the 2002–04 season, the old project came up again but was abandoned in favor of building a new and modern stadium. Again, financing needs could not be met. After a general renovation that took place in the 2004–05 season, the club returned to the Ali Sami Yen Stadium. Following the 1999 İzmit earthquake, the old Open Tribune was demolished and replaced in the 2005–2006 season for safety reasons.

Özhan Canaydın: Leaving Mecidiyeköy, new home in Aslantepe

Because Mecidiyeköy was now a part of the city center, state authorities objected to the expansion of the stadium in this district. A new piece of land was suggested to Galatasaray as an alternative.

The search for financing for the new stadium that would be built on this new plot continued over the period of 2004–07. In 2007, discussions with state authorities regarding the erection of a new Galatasaray stadium in Aslantepe yielded positive results. It was decided that the new stadium would be built within two years on the new land plot that would be transferred to Galatasaray, in exchange for the club's property in Mecidiyeköy on which the Ali Sami Yen Stadium stood.

A dream comes true

At the end of 2007, ten years after the initial announcement of the project in 1997, the groundbreaking for the new stadium was carried out (December 13, 2007) at a ceremony attended by state officials. The old project was put aside and a new project was contracted to Mete Arat in Germany. 2008, In Galatasaray's last year at the Ali Sami Yen Stadium, the Lower Closed Tribune was renovated in line with UEFA standards. 2009, The construction of the new stadium, the Rams Park, gained speed when the contracting company was changed. 2010, It was announced that the official opening of the new stadium would take place on January 15, 2011, with Prime Minister Recep Tayyip Erdoğan presiding. But in the opening ceremony, he was protested by spectators of Galatasaray.

Project overview

Project Year Location Capacity Suites Architect Cost Info
Faruk Süren project 1997–2001 Mecidiyeköy 40,482 125+72 boxes without outside seating BBB Architects US$118.5 million
($222 million in 2023 dollars[2])
2 different roof and stand styles. A Mall next to the stadium was also planned
Mehmet Cansun project 2001 Mecidiyeköy 35,000 132 GS member Architecture group* US$35 million
($60.2 million in 2023 dollars[2])
*Emre Arolat, Doğan Hasol, Tabanlioglu Architects, Eren Talu, DB Architects[15]
Özhan Canaydın:Back to Süren's project 2002–2005 Mecidiyeköy 40,482 125+72 boxes without outside seating BBB Architects US$90 million
($149 million in 2023 dollars[2])
Same project, just lower cost
Eren Talu bidding project 2007 Aslantepe 52,000 150 Populous n/a Eren Talu's project for the bid. GS logo as a ramp
Özhan Canaydın project 2007 Aslantepe 52,652 157 asp Stuttgart US$250 million
($339 million in 2023 dollars[2])
Built

Aslantepe

Exterior view
View of the stadium from the southeast stand corner, June 2017
View of the stadium from the northeast stand corner, June 2017

In recent years, numerous proposals had been put forward to demolish the current stadium and build a new, larger one on the same location, but this was impossible due to the lack of space. Finally, the club's stadium, Ali Sami Yen Stadium, was now going to be replaced with a new stadium near Maslak financial district. The former name of the district, Seyrantepe, was changed to Aslantepe (Lion Hill) after Galatasaray purchased the land; Aslan ("Lion") being Galatasaray's symbol. The idea was to realize a stadium on the model of Arena AufSchalke in Gelsenkirchen, Germany. The stadium will feature a retractable roof—the first of its kind in Turkey.

Auction process

Galatasaray has been in cooperation with TOKİ (one of the biggest construction organizations of Turkey, budgeted by the Turkish government).

Among the four companies that tendered proposals, the best offer was put forward by the Eren Talu Architecture – ALKE Partnership. The contract for the tender held for the construction of Galatasaray's new stadium was signed between TOKİ and Eren Talu-ALKE consortium on 23 October 2007.[16] The contract of the tender was realized by TOKİ and came to be known as the "Aslantepe Tender", covering the construction of a multipurpose sports complex with 52,652 spectator capacity on Aslantepe (formerly known as Seyrantepe) premises in return for building "Urban Social Infrastructure Areas" on 34.640 sq meters of land on which the present Ali Sami Yen Stadium is located.

There is a set period of 720 days for the construction of the stadium that will be built on the Aslantepe (formerly known as Seyrantepe) premises. The box count is 198 Part of the catering areas Turk Telekom Stadium consists of, is a VIP lounge room, VIP Market Area, Premium Food Court, Galatasaray Museum, Galatasaray Mega Store, 11 Galatasaray Store and a VIP restaurant. The modern stadium, contains five top and four underground levels.[17]

Partnership

Once the Eren Talu-ALKE consortium had won the tender for the stadium project, they proceeded to find a foreign technical partner with previous experience in sports-construction related projects. They were introduced to the Abu Dhabi Group and Al Zarooni Group, both headquartered in the UAE. Abu Dhabi Group (also known as Dhabi Group), the largest foreign investor group in Pakistan, and the Al Zarooni Group are investors in the gigantic 5.5 million sq.m. Dubai Sports City project that is currently under construction in Dubai. The Chairman of Abu Dhabi Group is His Highness Sheikh Nahayan Mabarak Al Nahayan, who is also the Federal Minister for Higher Education & Scientific Research of the UAE and a very important member of Abu Dhabi's Ruling Family. The Dhabi-Zarooni consortium acquired 51% of the Eren Talu-ALKE consortium's shares to co-invest a total of $650 million with them in the Aslantepe (New Stadium) and Mecidiyeköy (Old Stadium) projects.

Stating that a total amount of $650 million will be invested for the entire project, Eren Talu said, "$170 million of this amount will be spent for the stadium, in addition to $180 million which is the guaranteed TOKİ share, a $50 million additional TOKİ share and the remaining $250 million+ to be invested in the mixed-use development project intended in Mecidiyeköy". Talu added that TOKİ's participation in the project provides great advantage for the partnership and continued, "our partners had confidence in the public benefit of the project and decided to join within a short period of just 2 months". Talu said they have already spent $37 million so far in order to construct up to the current level of the stadium. Stating that the stadium is to be delivered on time on 29 October 2010, Talu said, "We are casting 1,500 cubic meters of concrete every day. We have driven 4,500 meters of piles into the ground. A labour force of above 350 workers is busy at the construction site 24 hours a day. The stadium is going to be so strong that it may even be used as a catastrophe relief center if required."

Talu said the project being contemplated on the land in Mecidiyeköy in lieu of the old Ali Sami Yen Stadium will be initiated in June 2009, and added, "the mixed-use development project that we are going to build on land measuring 34,600 square meters will include apartments, a large shopping center, offices and a five-star hotel. A total of $650 million will be invested in these two projects, and in return, we expect an income of about $1.3 billion when the Mecidiyeköy mixed-use complex is completed. Therefore, this is a highly profitable venture."

The total stadium construction is expected to cost around US$191 million, not including the US$145+ million which will be spent on upgrading the nearby infrastructure.

The construction of the stadium stopped twice a time. When Talu had financial problems once again, TOKİ cancelled the process in July 2009.[18] After termination of TOKİ-Talu agreement, TOKİ announced a new auction. Varyap-Uzunlar consortium won the auction[19] and construction restarted in September 2009. Galatasaray and TOKİ had an agreement that the stadium would be opened without retractable roofs which will be installed at the end of the season.[20]

Groundbreaking ceremony

A view of the stadium during its construction
Construction in July 2010

As of 13 December 2007, the construction has officially started after a glitzy reception where the club's board, some players, the minister of sports for Turkey and many other ministers attended. In the ceremony, then President Özhan Canaydın stated, in summary: "The Turkish World of Sports will gain another big facility with the Ali Sami Yen Sports Complex and we've gathered here to celebrate its groundbreaking ceremony. This work, which will be a value add to Istanbul and Turkey along with Turkish Sports, will also serve as an honorable monument that will signify the advanced position Turkish Sports has achieved and the phases it has passed through."[21]

Name

Türk Telekom Sponsorship

Special logo prepared for Türk Telekom Stadium

The naming rights were sold to Türk Telekom for a period of 10 years for US$10.25 million a year. The stadium has officially replaced the Ali Sami Yen Stadium at the middle of the 2010–2011 Süper Lig season, under the name of Türk Telekom Arena. North tribune's name of this stadium were sold to Pegasus Airlines for €4 million a year. The contract ended in October 2013.[22][23] The naming rights of the first tier of the east tribune of Türk Telekom Stadium were also sold to Ülker for $2 million a year and will be named as Ülker Family Tribune.[24] All 198 suites' and 4,844 VIP seats' naming rights were sold to Denizbank for three years.[25]

On 18 December 2012 Galatasaray S.K. and Opel signed a 2.5-year contract for the naming rights of the Southstand.[26][27] The club will receive €1.5 million per year (€3.75 million in total).[28][29] On 24 September 2013 Galatasaray S.K. and Odeabank signed a five-year contract (€590,000 a year) for naming rights to the Northstand.[30][31]

NEF Sponsorship

In the statement made by Galatasaray Sports Club on 11 October 2021, it was announced that a stadium name sponsorship agreement would be made with the real estate developer NEF Gayrimenkul [tr].[32]

In the new notification made on 12 October 2021, a sponsorship and advertising promotion agreement regarding stadium naming rights worth 725,000,000 Turkish Liras + VAT for a total of 10 (5+5) seasons, including 5 seasons, was signed between Galatasaray Sports Club and Timur Şehircilik Planning A.Ş. explanation has been made.[33]

At the press conference held at the Ali Sami Yen Sports Complex on 12 October 2021, Galatasaray and Nef signed the largest stadium naming sponsorship agreement in Turkish sports history. The press launch of the agreement, which took place at the newly named Ali Sami Yen Sports Complex Nef Stadium, was held with the participation of Burak Elmas, President of Galatasaray Sports Club, and Erden Timur, Chairman of Nef Board of Directors.[34][35][36]

Rams Global sponsorship

On 21 July 2023, Rams Global became the stadium title sponsor of Ali Sami Yen Sports Complex under the name Rams Park.[37]

Individual stand sponsorships

Zdroj:https://en.wikipedia.org?pojem=Türk_Telekom_Stadium
Text je dostupný za podmienok Creative Commons Attribution/Share-Alike License 3.0 Unported; prípadne za ďalších podmienok. Podrobnejšie informácie nájdete na stránke Podmienky použitia.






Text je dostupný za podmienok Creative Commons Attribution/Share-Alike License 3.0 Unported; prípadne za ďalších podmienok.
Podrobnejšie informácie nájdete na stránke Podmienky použitia.

Your browser doesn’t support the object tag.

www.astronomia.sk | www.biologia.sk | www.botanika.sk | www.dejiny.sk | www.economy.sk | www.elektrotechnika.sk | www.estetika.sk | www.farmakologia.sk | www.filozofia.sk | Fyzika | www.futurologia.sk | www.genetika.sk | www.chemia.sk | www.lingvistika.sk | www.politologia.sk | www.psychologia.sk | www.sexuologia.sk | www.sociologia.sk | www.veda.sk I www.zoologia.sk


Stand Sponsor Duration € M/year Total € M
Stadium Türk Telekom 10 years (2011–2021) 7.5